FactoryListing Header
Go Back
Report Abuse

Foshan M&w Furniture Limited Company

ed0a8530b907dcf0aa4ec9d64a6251ea_10063
ed0a8530b907dcf0aa4ec9d64a6251ea_10063

Corporate Information

Metal workshop The metal workshop has a total area of 11,000 ㎡, with 120 technicians and 120 pieces of professional equipment, adopting the 6S workshop management mode. It takes 7 days from iron sheet cutting, laser cutting, bending, punching, welding, polishing, and powder coating to final packaging. The one-time pass rate of products reaches 99%. The monthly production of 10,000 steel cabinets and 8,000 desk frames reaches 2 million dollars.

Plactic Injection Workshop Plactic Injection Workshop The plastic injection workshop has a total area of 1,100 ㎡ and 20 technicians, adopting the 6S workshop management mode. The workshop has one 380T, one 180T, one 160T, and three 120T injection molding equipment working together at the same time. It takes two days from plastic injection and installation to final packaging. The one-time pass rate of products reaches 99%. The daily capacity reaches 12,000 turn-ons.

Die-casting workshop Die-casting workshop The die-casting workshop has a total area of 500 ㎡ and 5 technicians, adopting the 6S workshop management mode. The workshop has three zinc alloy die-casting equipment and one die-casting aluminum equipment working at the same time. It takes two days from die-casting, and installation to final packaging. The one-time pass rate of products reaches 99%. The daily capacity reaches 8000 turn-ons.

Powder coating Workshop Powder coating Workshop The powder coating workshop covers a total area of 2,000 ㎡, with 30 technicians and 2 powder coating production lines worth 10 million yuan, adopting the 6S digital lean production mode. It takes 4 days from cleaning, powder coating, and curing to final packaging. The one-time pass rate of products reaches 98%. The monthly production capacity reaches 1,200 tons.

Mould workshop Mould workshop The mould workshop covers a total area of 300 ㎡, with 12 technicians and 30 pieces of professional equipment, adopting the 6S workshop management mode. It takes 20 days from lathe processing, milling, drilling, heat treatment, grinding, wire cutting, and assembly to the final mold test. The one-time pass rate reached 80%, and the monthly production capacity reached 200 sets of molds, which ensured the compatibility of all accessories and reduced the product development cycle by 2/3.

Laboratory Laboratory The laboratory covers a total area of 200㎡, with 5 technicians and 20 pieces of professional equipment, adopting 6S on-site management. It is mainly responsible for physical property testing of boards, salt spray testing, product function testing, carton strength testing, product tension testing, formaldehyde release testing, and spraying adhesion testing. Sampling testing is conducted for each batch of products. Every three days is a testing cycle, and the one-time qualification rate reaches 98%.

Products & Services

  • office furniture
  • M&W
  • M&W office furniture manufacturer
  • modular office systems
  • office workstation
  • office system solutions

Company Facts

  • Employees: 2000
  • Country: China

Product Tags

Contact Information

There are no reviews yet.

Leave a Review

Your email address will not be published. Required fields are marked *